Term |
Description |
ADMD |
After Diversity Maximum Demand |
ADMS |
Advanced Distribution Management Systems |
AEMO |
Australian Energy Market Operator |
AI |
Artificial Intelligence |
AMI |
Advanced Metering Infrastructure (i.e. Smart Meters) |
AMP |
Asset Management Plan |
AMS |
Asset Management System |
ARC |
Audit Risk Committee |
AUC |
Assets Under Construction |
BA |
Business Assurance |
BBAR |
Building Blocks Allowed Returns |
BBC |
Benefit Based Charges |
BBI |
Benefit Based Investments |
BCG |
Boston Consulting Group |
BCP |
Business Continuity Plan |
BESS |
Battery Energy Storage Systems |
BEV |
Battery Electric Vehicle |
BP |
Business Plan |
CAB |
Contracted Asset Base |
CAIDI |
Customer Average Interruption Duration Index |
c/kWh |
Cents per kilowatt hour |
Cap cons |
Capital Contributions |
CAPEX |
Capital Expenditure |
CB |
Circuit Breaker |
CBD |
Central Business District |
CC or Com Com |
Commerce Commission |
CCC |
Climate Change Commission |
CCGT |
Combined Cycle Gas Turbines |
CCS |
Customer Compensation Scheme |
CCS |
Carbon Capture and Storage |
CCD |
Clean Car Discount |
CER |
Consumer Energy Resource |
CGA |
Consumer Guarantees ACT |
CIMS |
Co-ordinated Incident Management System |
Close Approach |
Tree trimming work in the ‘Close Working Zone’ and |
Code (the Code) |
Electricity Industry Participation Code 2010 |
CPI |
Consumer Price Index |
CPP |
Customised Price Path |
CRM |
Customer Relationship Management |
CSR |
Corporate Social Responsibility |
CT |
Current Transformer |
CY |
Calendar Year |
DC |
Direct Current |
DCF |
Discounted Cash Flow |
DDA |
Default Distributor Agreement |
DER |
Distributed Energy Resources |
DG |
Distributed generation |
DNO |
Distribution Network Operators |
DNSP |
Used in Australia meaning Distributed Network Service Provider |
DPP |
Default Price Path |
DR |
Demand Response |
DSM |
Demand Side Management |
DSO |
Distribution System Operator |
DT |
Distribution Transformer |
EA |
Electricity Authority |
EAAG |
Electricity Authority Advisory Group |
EBIT |
Earnings Before Interest and Tax |
EBITDA |
Earnings Before Interest, Taxes, Depreciation and Amortisation |
ECI |
Early Contractor Involvement |
ECNZ |
Electricity Corporation of New Zealand |
EDB |
Electrical Distribution Business |
EEA |
Electricity Engineers’ Association |
EECA |
Energy Efficiency & Conservation Authority |
EIEP |
Electricity Information Exchange Protocols |
Embedded Network |
A network reticulation owned by a distributor within another distributor's traditional network. |
ENA |
Electricity Networks Aotearoa |
ERANZ |
Electricity Retailers' Association of New Zealand |
ERP |
Emissions Reduction Plan |
ESG |
Environmental, Social and Governance |
ETS |
Emissions Trading Scheme |
EV |
Electric Vehicle |
FBT |
Fringe Benefit Tax |
FFO |
Funds From Operation |
FIR |
Fast Instantaneous Reserves |
FMA |
Financial Markets Authority |
FMD |
First Mover Disadvantage |
FN |
Future Network |
FSR |
Future Security and Resilience |
FTE |
Full Time Employee |
GDP |
Gross Domestic Product |
Gentailers |
Generators and Retailers |
GIC |
Gas Industry Company |
GIDI Fund |
Government Investment in Decarbonising Industry Fund |
Greenhouse gases |
Carbon dioxide, methane, nitrous oxide, and hydroflocarbons. These gases all cause changes in the earth's atmosphere |
Gross emissions |
The greenhouse gases that an economy produces, ignoring carbon offset (e.g., from forestry) |
GST |
Goods And Services Tax |
GTP |
Gas Transition Plan |
GW |
Gigawatt |
GWAP |
Generation Weighted Average Price |
GWh |
Gigawatt Hours |
GXP |
Grid Exit Point |
Huntly |
Refers to Huntly Power Station |
HHR |
Half Hour (referring to meters) |
HPL |
Highly Productive Land |
HV |
High Voltage |
HVDC |
High Voltage Direct Current |
HZ |
Hertz. A measure of frequency |
ICE |
Internal Combustion Engine |
ICP |
Installation Control Point |
ID |
Information Disclosures |
IASB |
International Accounting Standards Board |
IEA |
International Energy Agency |
IFRS |
International Financial Reporting Standards |
IM |
Input Methodologies |
IoT |
Internet Of Things |
IPP |
Individual Price Path |
IR |
Integrated Reporting |
IRA |
Inflation Reduction Act |
IRD |
Inland Revenue Department |
IRIS |
Incremental Rolling Incentives Scheme |
Kt |
Kilotonne |
kV |
Kilovolt |
kVA and kVAR |
Kilo Volt Amperes & Kilo Volt Amperes Reactive |
KW |
Kilowatt |
kWh |
Kilowatt hour |
Lake Onslow |
Refers to the Lake Onslow pumped hydro project |
LCOE |
Levelised Cost of Energy |
LGOIMA |
Local Government Official Information Meetings Act |
LOE |
Letter of Expectation |
LRMC |
Long Run Marginal Cost |
LTI |
Lost Time Injury |
LV |
Low Voltage |
MAR |
Maximum Allowable Revenue |
MBIE |
Ministry For Business, Innovation, and Employment |
MD |
Material Damage |
MDAG |
Market Development Advisory Group |
MEP |
Metering Equipment Provider |
MEUG |
Major Energy Users Group |
MMD |
Monthly Maximum Demand |
MOSP |
Market Operations Service Provider |
MREP |
Melbourne Renewable Energy Project |
Mt |
Mega tonne |
MV |
Medium Voltage |
mVA and mVAR |
Mega Volt Ampere and Mega Volt Amperes Reactive |
MVP |
Minimal Viable Product |
MW |
Megawatt |
MWh |
Megawatt Hours |
NEM |
National Electricity Market (Australia) |
Net emissions |
The greenhouse gases that an economy emits minus those gases taken out of the air, e.g., by new forestry planted |
NHH |
Non Half Hour (referring to meters) |
NPAT |
Net Profit After Tax |
NPV |
Net Present Value |
NREL |
National Renewable Energy Laboratory |
NTR |
Network Transformation Roadmap |
NZEM |
New Zealand Wholesale Electricity Market |
NZU |
New Zealand Unit |
OAG |
Office Of the Auditor General |
OCC |
Office of Conservation Campaign |
OCGT |
Open Cycle Gas Turbines |
OCI |
Other Comprehensive Income |
OECD |
Organisation For Economic Co-Operation and Development |
OFGEM |
Office Of Gas and Electricity Markets (UK) |
OMS |
Outage Management System |
OPEX |
Operating Expenditure |
ORDC |
Operating Reserve Demand Curve |
PHEV |
Plug-in Hybrid Electric Vehicles |
PI |
Professional Indemnity |
PJ |
Petajoule |
PL |
Public Liability |
POC |
Point of Connection |
POS |
Point of Supply |
PPA |
Power Purchase Agreement |
PPE |
Property, Plant and Equipment |
PPE |
Personal Protective Equipment |
PV |
Photovoltaic(s) |
PwC |
Price Waterhouse Coopers |
RAB |
Regulated Asset Base |
Rankines/Rankine units |
A type of steam turbine currently in use at Huntly power station |
Registry |
Electricity Registry |
RERT |
Reliability And Emergency Reserve Trader |
RESI |
Residential |
Residual load |
The amount of electricity that cannot be met by intermittent renewable capacity (e.g., wind and solar) |
REZ |
Renewable Energy Zones |
RM |
Reconciliation Manager |
RMA |
Resource Management Act |
RMU |
Ring Main Unit (distribution switchgear) |
RPT |
Related-party Transactions |
RRO |
Retailer Reliability Obligation |
SAIDI |
System Average Interruption Duration Index |
SAIFI |
System Average Interruption Frequency Index |
SCADA |
Supervisory Control And Data Acquisition |
SF6 |
Sulfur Hexafluoride |
SIR |
Sustained Instantaneous Reserve |
SO |
System Operator (run by Transpower) |
SOI |
Statement of Intent |
SPA |
Sale and Purchase Agreement |
SRMC |
Short Run Marginal Cost |
SWER |
Single Wire Earth Return |
TCFD |
Taskforce on Climate-Related Financial Disclosures |
Tiwai Point |
Refers To Tiwai Point Aluminium Smelter |
TNSP |
TNSP is a term used in Australia that stands for Transmission Network Service Provider |
Tonne (t) CO -e2 |
The unit for measuring the climate impact of the greenhouse gases and stands for tonnes of carbon dioxide equivalent. Each of the different greenhouse gases has a different impact on the atmosphere, so a weighting is given to the other gases so that we have an idea of the overall impact of greenhouse gases emitted. |
ToR |
Terms Of Reference |
TOTEX |
Total Expenditure |
TOU |
Time of Use |
TPM |
Transmission Pricing |
TSO |
Transmission System Operator |
TWh |
Terawatt Hours |
TX |
Transformer |
UNGI |
Underwriting New Generation Investments |
UoSA |
Use of System Agreement |
V |
Voltage |
VoLL |
Value of Lost Load |
VPP |
Virtual Power Plant |
VRE |
Variable Renewable Electricity |
VT |
Voltage Transformer |
WACC |
Weighted Average Cost of Capital |
WEC |
World Energy Council |
YTD |
Year To Date |
ZS |
Zone Substation |